Sign in

User name:(required)

Password:(required)

Join Us

join us

Your Name:(required)

Your Email:(required)

Your Message :

0/2000

Good 1 Mw Boiler 0.5 t/h 0.5 ton Steam Generator ...

Author: Ruby

Dec. 23, 2024

Good 1 Mw Boiler 0.5 t/h 0.5 ton Steam Generator ...

Shipping

Shipping solutions for the selected quantity are currently unavailable

Click here to get more.

0.5 Ton Gas & Oil Fired Horizontal Fire Tube Steam Boiler

-providing steam for industrial applications -providing hot water through heat exchanger -providing steam and hot water for commercial applications like hotel, hospital, etc

Production Applications -providing steam for industrial applications -providing hot water through heat exchanger -providing steam and hot water for commercial applications like hotel, hospital, etc

FAQ


Q1: Where is your company?


A1

: We are located in Guangzhou which is famous for international business and worldwide renowned Canton fair is held twice each year, it's the nearer and less cost to reach ports of Southeast Asia, Africa, Middle East, South America, Oceania and Europe.



Q2: What is the Warranty for the boilers?


A2

: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier. 



Q3: How about the installation and commissioning?


A3

: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers.



 Q4: What's the production lead time for delivery?


A4

: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc.

For more information, please visit Partedon Group.



 Q5: What about your payment term?


A5

: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.


Q6: What kind of documents will be provided?


A6

: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request.



 Q7: What's your MOQ?


A7

: Only 1 set, if you have more than that, you will get a more favorable price.



 Q8: How's the packaging & shipping


A8

: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container.

Are you interested in learning more about 0.5 Ton Gas Steam Generator? Contact us today to secure an expert consultation!

4

0

Comments

0/2000

All Comments (0)

Guest Posts

If you are interested in sending in a Guest Blogger Submission,welcome to write for us!

Your Name:(required)

Your Email:(required)

Subject:

Your Message:(required)

0/2000