Drywall tape
Sep. 30, 2024
Drywall tape
Ok last drywall question. I have bamboo flooring that's like 3/4" thick. But I will probably put in vinyl plank floors later, which might either go on top the bamboo (making it 3/8" taller still) or replace it (making it 3/8 lower). My wall is built onto the subfloor now. So there's hardly any baseplate showing above the bamboo to screw the drywall to, since the baseplate is sunk 3/4 deep.
Should I:
1. Cut out the bamboo and slide drywall down to 1/2" above subfloor (thus 1/4" BELOW the level of the current bamboo floor) so I can screw it to the wall baseplate
2. Leave a 1/4-1/2" gap between the bottom of the drywall and level of the bamboo floor. This will put the drywall barely overlapping the bottom plate of the wall. I won't be able to screw it between studs unless I add blocking. If I add floor on top of the bamboo later, it will be fine. If I change to thinner flooring later, there will be a retarded big gap, but the baseboard will cover it anyway.
I'm leaning towards #2.
You will get efficient and thoughtful service from Tuoxin.
Related links:
How long does fiberglass mesh screen last?
Contact us to discuss your requirements of Fiberglass Mesh Drywall Tape. Our experienced sales team can help you identify the options that best suit your needs.
QILIMA Self-Adhesive Fiberglass Drywall Joint Mesh Tape ...
Enter the characters you see below
Sorry, we just need to make sure you're not a robot. For best results, please make sure your browser is accepting cookies.
Want more information on Fiberglass Yarn manufacturer? Feel free to contact us.
27
0
0
Comments
All Comments (0)